Product description
This Aftermarket Fit Caterpillar Earth Moving S310C080 Turbo 248-5246 174755 Turbocharger with C9 engine.
Our company offers a complete line of quality remanufactured Turbochargers , Cartridge , Turbine wheel , Turbine Housing, Compress Wheel , Compress Housing , Bearing Housing , and Repair Kits. The applications cover from automotive, heavy duty and marine turbochargers. We specialized in supplying high quality replacement turbocharger suitable for Caterpillar , Cummins , Perkins , Toyota , Komatsu , Mitsubishi , Benz, MAN , Volvo , Iveco , and ect.
Please pay attention to the following information to confirm if the turbocharger or parts in the listing can match your vehicle. For more information, please contact us.
SYUAN Part No. | SY01-1011-01 | |||||||
Part No. | 248-5246, 174755 | |||||||
OE No. | 248-5246, 174755 | |||||||
Turbo Model | S310C080 | |||||||
Engine Model | C9 | |||||||
Application | Caterpillar Earth Moving, Machine 300C, 330C with C9 Engine | |||||||
Market Type | After Market | |||||||
Product condition | NEW |
Why Choose Us?
● Each Turbocharger is built to strict OEM specifications. Manufactured with 100% new components.
● Strong R&D team provide professional support to achieve performance-matched to your engine.
● Wide range of Aftermarket Turbochargers available for Caterpillar, Komatsu, Cummins and so on, ready to ship.
● SYUAN package or neutral packing.
● Certification: ISO9001& IATF16949
How can I make my turbo last longer?
1. Supplying your turbo with fresh engine oil and check turbocharger oil regularly to ensure high degree of cleanliness is maintained.
2. Oil functions is best within an optimum operating temperature around 190 to 220 degrees Fahrenheit.
3.Give the turbocharger a bit of time to cool down before shutting off the engine.
Warranty
All turbochargers carry a 12 months warranty from the date of supply. In terms of installation, please ensure that turbocharger is installed by a turbocharger technician or suitably qualified mechanic and all installation procedures have been carried out in full.